top of page
Specialize In Energy Efficient Buildings and Renovations
Sports Facilities / Commercial / Manufacturing / Industrial
Commercial Building & Retrofit provides complete solutions for all your space requirements. Using energy efficient conventional or metal building technology, Commercial Building & Retrofit can quickly design and build a custom facility
for your needs. And, the sooner you get into your new building, the sooner your investment pays off.
BENEFITS
-
Design Flexibility
-
Quality Materials and Workmanship
-
Rapid Occupancy
-
On Time and Inside Budget
The Sports Club
Project Specifications
​
-
CECO Metal Building
-
275' x 100' x 38' High
-
Standing Seam Roof
-
8 - Insulated Sky Lights
-
R-40 Insulation Roof
-
R-25 Insulation Walls
-
Kalwal Light Panels
-
Fire Suppression
-
Radiant Heat Tubes
-
Intake Louvers / Exhaust Fans
-
Insulated Man & Overhead Doors
-
BEST Lights Indirect LED's
-
Astro Turf
​
CECO Metal Building The Sports Club of West Bloomfield | The Sports Club of West Bloomfield Indoor Soccer Facility | Turn Key Project The Sports Club of West Bloomfield Indoor Soccer Facility |
---|---|---|
Finished Project Gary Yurich with Owner Don Arndt | CECO Standing Seam Roof with R-38 Insulation Eissmann Roof | 225' x 215' x 27' Height 50' x 50' Clear Span Bays |
Dewatering area Pouring Double Truck Well with Dock Levelers | 6 - 15 Ton RTU / LED Lights / Polished and Epoxy Floors | Expanshion Joint Between Existing Masonry Building and Metal Building |
Storm Sewers with 115 Additional Parking Spaces | Mountain Top Church Addition Setting Roof Trusses | Mountain Top Church Addition Pre-Fab 2 x 8 Walls |
Mountain Top Church Addition | Mountain Top Church Addition Ready to Pour Concrete | Franklin Athletic Club Renovation Installing New Storm Sewer & Underground Detention |
Concrete Floor over Existing Tennis Courts with 65 Electrical Outlets for Fitness Equipment | Masonry / Structural Steel / Custom Steel Stud / Fire Protection Turn Key | Custom Steel Stud work for Circular Windows |
Fire Rated Lumber for Platform Exercise Equipment | 50 Ton RTU and Ductwork / Indirect Lighting / R-25 Insulated Ceiling | CECO Metal Building for Port Huron Tennis Addition |
R-25 Insulated Ceiling / Indirect Lighting / Tennis Court Nets, Post and Curtains | Before - Oakland County Road Comm Remove Existing Windows in Three Buildings | After - Oakland County Road Comm Installed 2.5" Insulated Metal Panel |
Shawmut Mills Port Huron 33,000 Sq.Ft CECO Metal Building | Quad Sports Chicago BEST Lights Indirect Triangular LED | Court One East Gym Removed Tennis Courts and Built Out Fitness with Mezzanine & Basketball Courts |
90,000 Sq.Ft. Wall Insulation Renovation | University of Michigan Basketball Removed Cork Ceiling Installed ROD Suspension System | Franklin Athletic Club Removed 2 Tennis Courts Built out Basketball and Running Track |
Emmanuel Bethel Church Addition 13,000 Sq.Ft. Two story Class Rooms and Gym 1985 |
Dominion Reality/ Eissman Automotive
-
49,000 Sq.Ft.
-
Start to finish 7 months
-
CECO Metal Building
-
Standing Seam Roof
-
R-38 Insulation in Roof
-
R-25 Metal Walls
-
LED Lighting
-
6 - 15 Ton RTU
-
Fire Suppression
-
Gas and Air Lines
-
Epoxy & Polished Concrete
-
Insulated overhead doors
-
Double Truck Well
-
Dock Levers
bottom of page